Hooksett Fire Rescue Department Fee Schedule
Effective April 14, 2004
(Please call the Fire Dept., 623-7272 to verify fees and for more information.)

 

 

Permit

Valid For

Fee

Assembly

One Year

$60.00

Blasting

One Year

$225.00

Blast Standby per day (6 hours/1Firefighter) w/ vehicle

 

$360.00

Cistern or Dry Hydrant

Ninety Days

$125.00

Fire Alarm System Installation

Over 25,000 SF protected

Ninety Days

Ninety Days

$125.00

$275.00

Fire Sprinkler Systems Installation/Residential

Commercial under 25,000 SF protected

Over 25,000 SF protected

Ninety Days

Ninety Days

Ninety Days

$50.00

$125.00

$275.00

Fireworks Display

One Day

$125.00

Fireworks Sales (Actual cost of inspection with balance to be refunded after inspection is completed.)

One Year

$2,500.00 (Deposit)

Gas Pipe Installation (per unit plus pipe)

Ninety Days

$35.00

Gas Burner Equipment Installation

Ninety Days

$35.00/burner

Maintenance Permit (by company)

        Fire Extinguisher

          Fire Alarm

        Sprinkler/Standpipe

        Special Hazard

 

One Year

One Year

One Year

One Year

 

$35.00

$60.00

$60.00

$35.00

Oil Burner Equipment Installation

Ninety Days

$35.00/burner

Site Plan Review under 5,000 SF

5,000 to 15,000 SF

15,000 to 25,000 SF

Over 25,000 SF

(Fees include two (2) reviews; any additional reviews require additional fees.)

 

$25.00

$50.00

$75.00

$100.00

Plan Review (Fire Alarm, Sprinkler, Standpipe, Special Hazard, Life Safety)

         Under 5,000 SF

         5,000 to 15,000 SF

         15,000 to 25,000 SF

         Over 25,000 SF

 

Per Building

Per Building

Per Building

Per Building

 

$50.00

$150.00

$250.00

$500.00

Special Hazard Systems (Restaurant, Carbon Dioxide, Clean Agent, etc.)

         Pre-Engineered

           Engineered        

 

Ninety Days

Ninety Days

 

$75.00

$125.00

Standpipe System Installation

Ninety Days

$75.00

Underground Storage Tank Installation

           LPG tanks 500 gallons or less not included

Ninety Days

$75.00/tank

Underground Storage Tank Removal

Ninety Days

$75.00/tank

Other Fees

 

 

Inspections (per permit/new construction)

         One Rough Inspection – no charge

         One Final Inspection – no charge

         Re-inspection fee (due to failed 1st inspection)

         Each subsequent inspection

 

 

 

 

$75.00

$125.00

Incident Reports

 

$15.00

Investigation Reports

 

$0.50/page

Photocopies (8 ½ X 11)

 

$0.50/page

Photographs (4 X 6)

 

$1.00/photo

Detail Rate per firefighter/per hour w/ three (3) hour minimum (Download Special Event Detail App)

 

$55.00/hour

Detail Rate for use of fire apparatus per hour

 

$55.00/hour




 

 
     